- Streetsblog New York City - http://www.streetsblog.org -

Uptown Hudson River Greenway Detour in Effect

Posted By Brad Aaron On December 5, 2008 @ 1:04 pm In George Washington Bridge,Hudson River Greenway,Port Authority,Washington Heights | 6 Comments

greenwaygrab2.jpgA temporary detour [1] along the Hudson River Greenway in Washington Heights went into effect Thursday.

The closure, related to work on the George Washington Bridge, will reroute cyclists to Broadway and Ft. Washington Avenue between 158th and 181st Streets. According to a Port Authority flier [PDF [2]], pedestrians may access the park and riverfront through the tunnel at 172nd Street.

Interruptions are to occur on a "periodic" basis until December 31, "typically" from 7 a.m. to 6 p.m.


Article printed from Streetsblog New York City: http://www.streetsblog.org

URL to article: http://www.streetsblog.org/2008/12/05/uptown-hudson-river-greenway-detour-in-effect/

URLs in this post:

[1] temporary detour: http://www.streetsblog.org/2008/10/27/another-interruption-planned-for-hudson-greenway/

[2] PDF: http://www.streetsblog.org/wp-content/pdf/FortWashingtonGreenwayDiversionFinal3.pdf

Copyright © 2008 Streetsblog. All rights reserved.